
Notice of road repair on Line 10 between Yonge Street and the Line 10 Bridge.
WHEN: Work is scheduled to begin March 19, 2025 and is expected to continue until mid-May, weather permitting.
WHAT: Work will be undertaken to repair the slope failure, stabilize the bank and restore the paved road surface.
HOW YOU MAY BE AFFECTED: During this time, the road will be reduced to a single lane through the work zone. Motorists may also experience delays while equipment and materials are moving through the area or are being loaded and/or unloaded.
We apologize for any inconvenience you may experience during this time.

Contact Us