Utility companies requiring to occupy the Town's right-of-way to complete work on utility infrastructure will need to apply for a Utility Road Occupancy Permit (ROP).
Please note that payment and submission of an ROP application is not considered a valid permit. The Town will reach out to you to provide a valid permit upon satisfactory review of the permit application.
ROP applications must be submitted to the Town a minimum of 10 business days prior to the planned start date of work.
Prior to starting your ROP application, please ensure you have the following documents:
- A copy of an up to date WSIB Clearance Certificate.
- A copy of your Certificate of Insurance (The Town requires a minimum of $5,000,000.00 in General Liability and the Town must be listed as additionally insured.
- Approved Municipal Consent (if applicable).
- A drawing/ sketch of the proposed works.
- A Traffic Control Plan (TCP).
- A photo of the work area showing pre-existing conditions.
- A Restoration Plan