Learn more about the ongoing Engineering Studies and Environmental Assessments happening in BWG. Please visit our Completed Projects page for information on recently completed projects.

This project includes a review and analysis of the Town's entire wastewater network.

This study looks into BWG's future in terms of population, commuter needs, and more.

This project will transform Holland Street to align with the Town’s Strategic Plan.

The project includes the assessment of several options to address increasing traffic on Line 8.

The traffic mitigation strategy will address existing traffic concerns and support safer streets in BWG.

The Town of BWG completed an Addendum to the 2012 Bradford Water Pollution Control Environmental Study Report
Contact Us