Bradford Security of Water Supply Project

Project​​ Description

The objective of the Bradford Security of Water Supply (SWS) projects is to unlock water supply capacity, and in doing so, allow Bradford to continue to grow. 

The SWS projects will:

  • Reduce the system constraints,
  • Increase system robustness, and
  • Mitigate system risks.

The goal of these measures is to ensure Bradford has the water supply to service its population growth to 2031.

​Project Status

SWS Project 1: Water System Optimization & State of Good Repair Study

This project began with an evaluation of the existing water supply, storage and transmission system. W then recommended repairs, upgrades, and improvements necessary to reduce constraints and increase the robustness of the water system. 

​Key Dates:

System Evaluation & Reviews

Q2 2020 to Q1 2021 - Complete


SWS Project 2: Water Wells Emergency Backup Power

This project increased system robustness and provided backup power at the Church Wells site in the event of a power loss or brownout.​

Key Dates:

Detailed Design

2020

​Construction Start

2021

​Construction Completion

2022 - Complete


SWS Project 3: Noble Drive Standpipe Refurbishment

The project refurbished and extended the useful life of the Noble Dr. Standpipe (Bradford Standpipe No.2).  

Key Dates:

Detailed Design

2020

​Construction Start

2021

​Construction Completion

2022 - Complete


SWS Project 4: Water System Optimization and State of Good Repair Study Upgrades Project

​Implementation of projects recommended by the Water System Optimization & State of Good Repair study.

Key Dates:

Environmental Assessment

TBD

Detailed Design

2021-2022

​Construction Start

2023

​Construction Completion

2025