Project Description
The objective of the Bradford Security of Water Supply (SWS) projects is to unlock water supply capacity, and in doing so, allow Bradford to continue to grow.
The SWS projects will:
- Reduce the system constraints,
- Increase system robustness, and
- Mitigate system risks.
The goal of these measures is to ensure Bradford has the water supply to service its population growth to 2031.
Project Status
SWS Project 1: Water System Optimization & State of Good Repair Study
This project began with an evaluation of the existing water supply, storage and transmission system. W then recommended repairs, upgrades, and improvements necessary to reduce constraints and increase the robustness of the water system.
Key Dates: | |
---|---|
System Evaluation & Reviews |
Q2 2020 to Q1 2021 - Complete |
SWS Project 2: Water Wells Emergency Backup Power
This project increased system robustness and provided backup power at the Church Wells site in the event of a power loss or brownout.
Key Dates: | |
---|---|
Detailed Design |
2020 |
Construction Start |
2021 |
Construction Completion |
2022 - Complete |
SWS Project 3: Noble Drive Standpipe Refurbishment
The project refurbished and extended the useful life of the Noble Dr. Standpipe (Bradford Standpipe No.2).
Key Dates: | |
---|---|
Detailed Design |
2020 |
Construction Start |
2021 |
Construction Completion |
2022 - Complete |
SWS Project 4: Water System Optimization and State of Good Repair Study Upgrades Project
Implementation of projects recommended by the Water System Optimization & State of Good Repair study.
Key Dates: | |
---|---|
Environmental Assessment |
TBD |
Detailed Design |
2021-2022 |
Construction Start |
2023 |
Construction Completion |
2025 |