Bradford Water Pollution Control Plant

Project Description

The objective of the Bradford Water Pollution Control Plant (WPCP) upgrades projects is to address the plant's operational requirements. This will ensure that there is adequate wastewater treatment capacity to service growth to 2031. The project consists of three phases.

​Project Status

Project Phase 1: WPCP Reviews and Upgrades Project

Plant state of good repair analysis, process optimization study and upgrades validation.  Design and construction for upgrades to the plant headworks building, chemical/ odour control systems and a new sludge thickening system.

Key Dates:

Reviews

2020

​Design

2020-2022

​Construction

2021-2023


Project Phase 2: WPCP Tertiary Treatment System Upgrades Project

Design and construction for plant tertiary treatment system upgrades.

Key Dates:

​Design

2020-2022

​Construction

2022-2025


Project Phase 3: WPCP Optimization and State of Good Repair Analysis Upgrades Project

Design and construction for projects recommended by the plant process optimization and state of good repair analyses. 

Key Dates:

​Design

2021-2022

​Construction

2022-2024